Concrete Block Wall Construction: Footings, Mortar, Laying and Reinforcement

How to build a concrete block wall properly — footings, mortar types and mixes, laying cinder blocks course by course, reinforcement, bond beams, capping and common mistakes.

By the Brick Machine Factory engineering teamPublished Updated 9 min read
Concrete Block Wall Construction: Footings, Mortar, Laying and Reinforcement

Key takeaways

  • A block wall starts with a level, reinforced concrete footing — typically twice the wall thickness wide.
  • Use a mortar suited to the job (e.g. ASTM C270 Type N for general above-grade walls, Type S for foundations and retaining walls).
  • Lay the corners (leads) first, string a line, and keep 10 mm (⅜ in) joints.
  • Reinforce and grout cores where designed; add bond beams at lintel and top-of-wall level.

Good blocks deserve good walls. Whether you are a contractor or a block producer advising customers, these are the essentials of concrete block wall construction.

1. Footing

  • Width: typically about twice the wall thickness (e.g. 400 mm for a 200 mm wall); depth below frost line or to firm soil.
  • Reinforced concrete with starter bars where the wall is reinforced.
  • Top surface level — the first course depends on it.

2. Mortar

Mortar type (ASTM C270)Approx. proportion cement : lime : sandUse
Type M1 : ¼ : 3Below grade, high loads
Type S1 : ½ : 4½Foundations, retaining walls, high wind/seismic
Type N1 : 1 : 6General above-grade walls

Where lime is not used, 1:4 to 1:6 cement:sand mortars are common; follow local codes. Mix to a workable, buttery consistency and use within about two hours.

3. Laying cinder blocks step by step

  1. Snap a chalk line; dry-lay the first course to check spacing.
  2. Spread a full mortar bed for the first course; set corner blocks and level them in both directions.
  3. Build up the corners (leads) four to five courses, checking level, plumb and gauge.
  4. Stretch a mason's line between corners and fill in each course.
  5. Butter the ends (head joints) of each block; lay in running bond (half-block offset).
  6. Tool joints when thumbprint-hard for weather resistance.

4. Reinforcement and bond beams

  • Vertical bars in grouted cores at corners, jambs and specified spacing.
  • Horizontal joint reinforcement (ladder or truss) every second or third course where specified.
  • Bond beams (U-blocks with rebar and grout) at lintel and roof level.
  • Grout in lifts, consolidating with a rod or vibrator.

5. Capping, gluing and finishing

Capping (coping) blocks can be set in mortar or bonded with a polyurethane masonry construction adhesive suitable for exterior use — a common way to “glue cement blocks together” for caps and garden walls. Structural walls should still use mortar. Finishing options: render, paint and sealers.

Common mistakes

  • Laying wet or freshly made blocks — use cured blocks to limit shrinkage cracking.
  • Uneven first course.
  • No control joints in long walls.
  • Skipping drainage behind retaining walls — see retaining walls.

Block quality affects the wall

Consistent block height means thinner, more uniform joints and less plaster. Hydraulic-pressed blocks from lines like the QT5-15 hold height within tight tolerances — a selling point for producers supplying contractors.

Machines for this application

Supplying blocks to contractors?

Send your target daily output, product sizes, local raw materials and voltage. Our engineers reply within 24 hours with a recommended configuration, layout and itemised quotation.

Get a free plant proposal or chat on WhatsApp

Frequently asked questions

What mortar should I use for cinder blocks?

Type N for general above-grade walls and Type S for foundations and retaining walls (ASTM C270), or a local equivalent cement:sand mortar.

How wide should a footing for a block wall be?

Typically about twice the wall thickness, designed for local soil and loads.

Can I glue concrete blocks together instead of mortar?

Adhesive is fine for caps and small garden walls; structural walls should use mortar as designed.

Brick Machine Factory Engineering Team

Sales and process engineers who design block, paver and CEB plants and commission them on site. About us

Free plant proposal

Tell us your target output. We’ll design the plant.

Send your block sizes, daily output and power supply. A sales engineer replies within 24 hours with a configuration, layout and quotation.

Send an inquiry

Reply within 24 hours, Mon–Sat.